Floors and flooring 1.
Difference between dpc and german floor.
The perimeter is 50 feet by 80 feet but there is 33 feet by 14 6 that will not have a german floor on it right in the center.
Floor covering is a term to generically describe any finish material applied over a floor structure to provide a walking surface.
Damp proofing a building will ensure that all general moisture does not saturate the walls.
Screed come to lower than the dpc brick.
Answer 1 of 1.
5 when there is cracking on the block wall for non major cracks the german floor can serve as a breaking point that will stop blocks from extending crack lines into the other parts of the building.
Civilengineers what is plinth beam.
Flooring is the general term for a permanent covering of a floor or for the work of installing such a floor covering.
It is a requirement that the dpc is at least 150mm above ground level.
I want to know how many tons of granite sharp sand or stone dust undecided yet and cement i will need.
What is dpc what is tie beam what is floor beam what is top beam construction of plinth beam dpc tie beam and floor beam.
Oversite concrete is often reffered to as german floor by the laymen others mistook it for dpc however oversite concrete is the mass concrete that you pour to cover the entire lenght and breadth of a building on the ground floor to serve as a source of additional support to the structural stability of a building especially storey buildings.
Engr fazal e jalal 2.
I m building an out house can the internal floor level be lower than the external dpc level.
Looking to try and get some more internal height will this cause any damp etc.
It is called a course because wall construction used to consist of courses rows of bricks laid in succession on each ot.
Hello thanks for your question on the difference between dpm damp proof membrane and dpc damp proof course damp proofing is a term that refers to water resistant material that is designed in order to prohibit dampness from occurring.
The floor can be wherever you want it obviously even well below ground level in the case of basements so long as it is.
Not sure what any of these are.
That is if the crack is up then it may not extend beyond the german floor towards the foundation and if the minor crack is from blocks under the german floor it may not extend beyond it.