Step 2 drill four holes in each corner of the outline you made of the sleeve drill one hole.
Downspout into gutter.
The flexible design easily bends and holds its shape and can be extended from 25 in.
When water goes over the edge like the above picture it not only washes away your foundation which causes basement leaks but it also runs down the walls.
This will prevent the water from going over the edge and washing away your foundation.
Watch and learn how and stop.
Measure in 4 inches from the end corner of the gutter with a tape measure and mark the bottom of the gutter with a pencil.
Gutters over flows add downspout to bring water down from roof faster.
The only solution here is to extend that downspout so that it connects into the lower level gutter.
Use this downspout extension to divert water away from the foundation or connect to drainage pipe and catch basin to control drainage.
Step 2 drill a hole in the bottom of the gutter at the 4 inch mark with a 1 inch hole saw attachment to the drill.
On the bottom of the gutter itself take a pencil or marker and trace the outline of a sleeve.
This is where the rainwater is lead away from the building s foundation so that no rainwater is able to pool around the building.
This is the thing that connects the gutter and downspout together so it is important that it is placed correctly and securely.