Installation is a straightforward job that any skilled diyer can do by attaching hanger wires to the ceiling joists with nails or screws and then suspending the main beams and cross tees.
Drop ceiling installation guide.
Then 24 x 24 or 24 x 48 panels are inserted into the open metal grid and the drop ceiling is complete.
To allow for ceiling tile installation and accessibility the minimum drop is 3 with traditional hanger wire or 2 5 with quickhang grid hooks.
From layout and planning to execution this guide will walk you through the key steps of installing a ceiling.
Learn about how to install a drop ceiling including what materials and tools are needed to complete your project.
Cut the main tees for the drop ceiling hangers.
Save on installation costs by combining similar jobs and by being willing to have your project completed during low demand periods for the vendor installer.
Measure and cut the main tees according to a cross tee guideline.
For an accurate estimate in your area enter your zip code in the calculator above.
Reduce total project cost by having multiple vendors bid on the same detailed work specification of your drop ceiling project.
Quickhang instructions are notated by a gray background.
Start by measuring the dimensions of your room so you can cut the runners of the grid to fit.
Main beams are typically installed on 4 centers.
Now let s get to the meat and potatoes of how to install a drop ceiling.
The cross tee slots must line up.
Metal channel thats shapped like an l.
Panels may be stored in areas with a temperature between 60 and 80 f.
Once you ve figured out the size of the border row measure back from the cross tee slots and cut your main tees to size.
Keep in mind that additional clearance will be required if recessed lighting is being used.
Full length main tees bold lines are spaced 4 on center o c as measured from the center of one tee to the center of the next with 4 cross tees installed perpendicular 2 o c.
You will install this first around the entire perimeter of the wall a few inches below your ceiling hence the drop in drop ceiling.
Determine the exact height at which the suspended ceiling will be installed.
If your room configuration is unusual you may require additional components.
Allow a minimum of 3 to 4 inches for clearance between the old ceiling and the new ceiling.
1 draw the room to scale.
Also be sure to check that the relative humidity is below 70.
Steps for installing a drop ceiling in a nutshell installing a drop ceiling has several parts.
Drop ceiling installation tools and materials.
Let your ceiling panels adjust to the environment in the room of installation.
Then use wire to hang the main runners from your ceiling joists.
Don t assume the wall is straight.
To install a drop ceiling you will first need to install a grid system to support its weight.